Independent Auckland guide
Timber fence materials calculator
Create a preliminary take-off for a vertical paling fence; edit the construction assumptions to match the design.
Output includes
Posts, bays, total rail metres, palings including 5% cutting allowance, concrete bags, approximate fixings and material cost.
This does not determine structural adequacy. Wind, height, soil, post section, embedment and rail size must be designed for the site.
Plan the next step
Turn research into a quote-ready brief
Save your fence type, length, site constraints and photos so contractors can assess the same scope.